Protecting Existing Buildings from Termite Damage in Maharashtra

Post-construction anti-termite treatment is required when a building is already completed and either has active termite infestation or has never received pre-construction treatment.

The drilling and injection method introduces termiticide directly into the soil beneath and around the building, creating a chemical barrier equivalent in effect to pre-construction treatment.

Post-construction treatment requires careful execution to be effective. Incorrect dilution rates or missing critical injection points leave gaps through which termites will enter.

Our team uses calibrated injection equipment and follows IS 6313 protocols for dosage and spacing.

Warning Signs

Signs You Need Professional Post-Construction Control

  • Mud tubes inside or outside the building
    Visible mud tubes confirm active termite infestation and indicate the colony has found a way into the structure.
  • Hollow-sounding wooden fixtures
    Tap wooden floors, door frames, and furniture. Hollow sounds indicate termites have eaten through the interior.
  • Bubbling or darkening paint near walls
    Paint damage near wall-floor junctions and skirting boards can indicate termite activity beneath.
  • Sawdust-like material near wooden items
    Fine powder near wooden fixtures can indicate termite frass from active feeding below the surface.
  • Property more than 5 years old with no treatment
    Most buildings in Maharashtra more than 5 years old have never had formal anti-termite treatment and are at risk.
Our Approach

Our 6-Step Post-Construction Control Protocol

01
Property Inspection & Activity Assessment

We inspect the entire building for signs of active termite activity and document findings before mapping the treatment zone.

02
Drilling Planning

We plan drill hole positions at IS 6313-specified intervals along all internal wall-floor junctions, expansion joints, utility entry pipes, and external foundation perimeter.

03
Drilling & Injection

Drill holes are of 10mm and are drilled at calculated intervals. Termiticide is injected under pressure using calibrated equipment.

04
External Perimeter Treatment

The soil alongside the external foundation is rod-injected to treat the vertical soil face adjacent to the foundation.

05
Hole Filling & Surface Repair

After injection, all drill holes are sealed with cement filler. External trench work is backfilled and compacted.

06
Certificate Issuance

A treatment certificate is issued documenting treatment date, property address, area treated, products used, method applied, and warranty period.

Post-Construction problem in Maharashtra?
Free inspection · Same-day response available
Safety

Minimal Disruption, Maximum Protection

Post-construction treatment is far less intrusive than most expect. Drill holes are of 10mm, filled and sealed immediately after injection. A standard 3-bedroom home is typically completed in one day.

We schedule treatment to minimise disruption — one room section at a time, with residents able to use the property throughout.

All products are IS 6313-specified termiticides registered under the Insecticides Act.

10mm Drill Holes — Minimal DamageHoles Sealed After TreatmentIS 6313 Compliant DosageCertificate for Property RecordsOne-Day Treatment TypicalResidential & Commercial
What Customers Say

Trusted by Maharashtra Homes & Businesses

★★★★★
Drill holes were small and neatly sealed. Termite injection was done in one day with minimal dust and disruption.
Ramesh Tiwari
Homeowner · Satara
Verified Customer
★★★★★
They mapped where drilling was needed and why. Treatment certificate was handed over the same evening — very professional.
Sandhya Kulkarni
Villa owner · Satara
Verified Customer
FAQ

Post-Construction Anti-Termite — Common Questions

How many holes will be drilled in my home?+

Typically every 30cm along internal wall-floor junctions and every 45cm along external perimeter. For a standard 3BHK, expect 60-100 holes — all sealed after treatment.

Will the drilling damage my flooring?+

Drill holes are of 10mm and sealed with cement filler. Minimal visual impact. Filled holes become barely noticeable after a few weeks.

How long does post-construction termite treatment take?+

A standard 2-3 bedroom home typically takes one day.

Do I need to vacate during post-construction termite treatment?+

No vacating required.

How long does post-construction treatment protection last?+

3-7 years under normal soil conditions. Annual inspection recommended.

Can post-construction treatment be done if termites are already active?+

Yes. Post-construction treatment eliminates both active infestation and prevents re-entry.

Related Services

Other Pest Control Services in Maharashtra